Loading content...
Start with a $10 monthly subscription. After tax and processing fees, the complete net receipt is attributed to qualifying titles using that member's viewing. Each title's licence share is then applied once. Delivery is a separate title-level deduction, shared at the same contracted percentage.
Monthly subscription paid in.
Assumed 3% + $0.30.
The full post-processing net is attributed across qualifying titles.
A separate title-level cost; it never reduces the subscription receipt twice.
A 50% title share of $9.40attributed revenue, less the same share of delivery ($0.10).
The remainder after the same title share and Upstream's share of delivery.
Default example: two full films and two half-complete films. Move the four sliders and the title attribution changes using completion raised to the current 0.75 exponent. This is an illustration; the live rebuild also applies its eligibility threshold and content-category weights.
The full $9.40 post-processing net follows the subscriber's qualifying title scores. Each title's contracted share is applied afterward, once.
With a 0.75 exponent, two full and two half-complete titles settle around 31.4%, 31.4%, 18.6%, and 18.6% before category weights.
The subscription starts as one concrete dollar amount instead of an abstract pool.
The complete post-processing net reaches title attribution; delivery is a separate source.
The applicable title licence percentage is applied once to revenue and delivery lines.
If you want to talk through subscription allocation, delivery assumptions, or reporting, start the submission flow.
Submit a film